Portfolio Tag: pre-stressed concrete bridge

Cheese Factory Road Bridge

Spectra provided final engineering design services for the replacement and realignment of Cheese Factory Road Bridge over Nine Mile Creek. This project was 100% funded by the Town of Deerfield. The existing 21 foot, single-span bridge was replaced with a 45 foot single-span, pre-stressed concrete bridge. The roadway was raised two feet to alleviate flooding…
Read more